As some of you may know, the LMM team are heavily involved in a small model railway club known as the NCMA, or Nearly Competent Modellers Association.
Although LMM and the NCMA are two separate entities, they work closely with one another as the NCMA helps provide LMM with content for videos, from building modules, to attending shows. And likewise the attention given to the NCMA via the LMM channel helps to open doors, allowing the club to exhibit at events it wouldn’t otherwise be able to. As I’m sure you saw the NCMA attended the National Festival of Railway Modelling at the NEC last year, a mere 8 months after the NCMA’s debut at the statfold barn model railway show in april of 2024.
Taking such a new, frankly inexperienced club to such a large show is well… dumb. but we pulled it off, had a great time, and even got complimented by the event organisers for always having something moving and putting on a great show. I’m sure at some point I’ll tell you all about it, but that’s not the point of todays post that I’m slowly rambling my way towards. No, todays post is about much more current events. Specifically the Tonys Trains 10 year anniversary show happening this weekend at the Mountsorrel and Rothley community heritage center.
A few months back Tony (Of Tonys Trains of Rugby fame) asked the NCMA (and by extension, LMM) if they would like to bring along the modular layout, or parts of it, for the show. and obviously, we said yes.
The thing hasn’t been out since the NEC show last year, about 6 months ago, so of course, every evening for the last few weeks has been spent inspecting, repairing, cleaning, painting, and modifying the modules all with the hope they will work. Most of this effort won’t be noticed, as repairs often aren’t. Will anyone notice that a tree is missing on one board and has been replaced with a bush after an unfortunate “gravity assisted descent” incident snapped it off. But, I guess that’s the point. People will notice the broken tree. But not the hours of work that’s gone into repairing the damage sustained thanks to the cruel and unpredictable forces of gravity.
But, what does it take to get the thing to a show?
First, we put out a google form to the club members, to find out who is able and willing to attend, and what modules they are bringing, this show has 5 of us attending, with 5 modules, from that, we are able to make a plan of the order the modules will be assembled and placed within the layout, we like to try and keep the passing loop central within the layout as it helps keep things moving.
After that we have a chat between us, and work out how much rolling stock we need, and who’s bringing the other gear thats usually hidden behind the layout (loco service kits and the like).
With that organized, we set about organizing our own accomodation and transport, van rental, if needed and all the other logistics of actually getting to the venue. For this show, two of the members live locally, another two (myself included) have got a room at a nearby hotel and the final member is only able to attend on the Sunday, driving to the show and back on the day.
Tony and the venue have allocated Friday for setting up, so myself and one other member, arrived at the venue today and got the railway set up as much as we could. Now unfortunately the other members are unable to make it until Saturday morning. One of whom, who shall remain nameless here, is unable to make it until Saturday morning, about 90minutes before the show opens to the public. Unfortunately that same member is bringing the controllers and the passing loop module.
Once we actually get to the venue and start building, it always follows the same routine, first we build the modules, starting with the traversers at the end and work our way round, bolting legs onto boards, then attaching the boards to each other ensuring the railway is level, and the track joins between boards meet up. Then we go around making any fine adjustments to the height and alignment. We electrically connect the modules using banana leads and sockets built into each module. Attach the controllers and power feeds, before finally running a single test train along the railway in both directions. Assuming that’s successful we then fill out the traversers with rolling stock and start playing… Erm… I mean operating… Testing… Yeah, testing, to ensure it all works.
But, as we don’t have the final module at the railway for now, two halves of the layout are built, but there’s a 2meter gap in the middle of it. We don’t know if it works, we’ll find out tomorrow morning, about 20minutes before the show starts.
To bring this ramble to a close, it’s the NCMA’s first show of 2025 tomorrow, the layout is untested and half built. But as a club we’ve overcome bigger obstacles so I’m feeling confident.
I guess you’ll have to wait and see if a video of the event appears on LMM. Or you could pop down to the venue and find out first hand. After all, what’s life without a last minute, ill planned model railway adventure?